It is significant to make clear something useful to the chain installation. These notices can reduce mistakes and increase the service life.
Before assemble the Trans Vision chain. The follow should be done:
1 Cleanliness of the sprocket teeth (cement dust, weld spatter.etc) should be done before the installation work.
2 Temporary positioning of the lower chain section at present, in restricted space, maneuvering of large sections is often simplified by using the space between shafts which will later be occupied by the chain.
To be sure chat the chain is clean and free from debris. At the same time, the chain should be around the sprocket and it must be completely match the sprocket. The joining is accomplished at the mid of the mid span or the drive more easily. Draw the chain ends together with a chain clamp or rope tackle block. Ensure that the strength of the drawing tackle is sufficient to hold the chain while inserting the joining link of multiplex chain. Don’t detach the tackle and confirm the intermediate plates are assembled until the link is completely assembled. If it was only partially inserted through inner links, the pins couldn’t support the weight of the chain.
△If the chain’s average center distance about 30-60 times chain pitch, the mid point of the longest span can be fully moved by hand in accordance with dimension “f”shown in the diagram followed:
The appropriate chain installation could improve the utilization rate remarkably in practical application.